Santa Fe National Forest - Pecos Ranger District Work Projects

Several summer work projects by the Pecos Chapter included  repairs to the
Jack’s Creek to Iron Gate trail. Members worked to level out and reinforce an
area that combined a steep drop off, slip rock and a narrow trail. A large section
of the bank side was cut back and dirt was packed over the slip rock. In addition,
the drop off side was reinforced and built up with logs. Water bars were added to
the upper end of this section  to divert rain water off the trail.